Turnover timing for rentals
Between tenants, cleaning and clearance are the last steps before the keys change hands, after any paint repair, door work or abatement is finished. Build the schedule backward from the move-in date: the work itself, final cleaning, the one-hour wait before sampling after abatement, lab turnaround, and room for a re-clean. In Farmers Branch, a 2021 city form calls for a new certificate of occupancy, with an inspection, whenever the tenants change, so that city step also has to fit in the same window.
Records to keep
File the clearance report with the abatement or renovation paperwork. Federal disclosure rules require landlords and sellers of pre-1978 housing to share the lead reports they have with new tenants and buyers and to keep signed disclosure records for three years. A passing clearance report from a vacant unit is also a useful baseline if a tenant later raises a lead concern.
Where the dust came from deteriorated paint in a rental, rental property lead hazard control covers the repairs that stop it returning. For a permanent fix to the painted surfaces themselves, see interior lead paint abatement. Everything else we do is listed on the Irving Lead Paint Removal home page.